Visiting timetable09:00 AM08:30 PM
Monday, January 5, 2026
Pg. de Gràcia, 92, 08008 Barcelona, Spain
Back to conservation
maintenance

Conservation at La Pedrera: Stone, Iron, and Color

Inside Casa Milà’s conservation: limestone cleaning, iron protection, and plaster restoration.

12/30/2025
14 min read
La Pedrera façade detail after conservation work revealing clean stone

Conservators combine surveys, laser cleaning, and micro‑mortar repairs. Ironwork is de‑rusted, primed, and painted; painted plaster is consolidated.

Façade after cleaning


Practices

  • Diagnostics: map material decay to guide interventions.
  • Minimalism: least invasive methods first.
  • Documentation: before/after records assure continuity.

Material ↔ Method Matrix

Material Method Goal
Limestone Laser cleaning; consolidation Remove grime; stabilize
Ironwork De‑rust; prime; paint Halt corrosion; protect detail
Plaster Consolidate; retouch Strengthen; color fidelity

Conservation is a dialogue: past intent, present science, future care.


Care Schedule

  • Periodic surveys for façade and courtyards.
  • Targeted repairs post heavy rainfall.
  • Repainting cycles for ironwork.

About the Author

Architecture Writer

Architecture Writer

I created this guide to make your La Pedrera visit simple, insightful, and stress‑free.

Tags

Restoration
Conservation
Stone
Ironwork
Color

Comments (0)

Leave a Comment

Loading comments...